Skip to content
  • WELCOME
  • PRE-APPLICATION CONSULTATION
  • VIRTUAL EXHIBITION
    • FEEDBACK FORM
  • ONSHORE WIND
  • COMMUNITY
  • NEWS & MEDIA
  • GET IN TOUCH
  • English
  • Welsh

Sarah Jones

Formal Public Consultation launched for Foel Fach Wind Farm in north Wales

Renewable energy developers Coriolis Energy and ESB have launched a formal public consultation for the proposed Foel Fach Wind Farm, near Bala, north Wales. If approved, this 72 MW,10...

Posted on 15/12/2025 (Updated: 11/12/2025) by Sarah Jones
Continue Reading Formal Public Consultation launched for Foel Fach Wind Farm in north Wales

Foel Fach team preparing for pre-application consultation

The project team has been busy this year continuing to undertake assessments and surveys as we develop our draft plans for Foel Fach Wind Farm, for example:

ornithological surveys...

Posted on 14/08/2025 (Updated: 14/08/2025) by Sarah Jones
Continue Reading Foel Fach team preparing for pre-application consultation

Feedback from the informal consultation

Between 16th September and 14th October 2024 we ran an informal consultation on our early-stage plans for Foel Fach Wind Farm.

During this time, we wrote to residents living...

Posted on 16/12/2024 (Updated: 17/12/2024) by Sarah Jones
Continue Reading Feedback from the informal consultation

© Foel Fach 2024-2025 | Website design and build by EPLS Design