YMGYNGHORIAD CYN YMGEISIO
Gweld yr holl ddogfennau cynllunio drafft
Rydym yn bwriadu gwneud cais i Weinidogion Cymru am ganiatâd cynllunio mewn perthynas â Datblygiad o Arwyddocâd Cenedlaethol ar gyfer fferm wynt ar y tir sy’n cynnwys 10 tyrbin gwynt, System Storio Ynni Batri, cwrt is-orsaf ar gyfer y prosiect a gwaith seilwaith ategol cysylltiedig.
Rydym hefyd yn gwneud cais am ganiatâd o dan Adran 16 o Ddeddf Tiroedd Comin 2006 i ddadgofrestru a chyfnewid tir comin.
Cyhoeddir y Cais Cynllunio drafft llawn isod, yn unol ag erthygl 8 (1) (b) (i) – (viii) Gorchymyn Datblygiadau o Arwyddocâd Cenedlaethol (Gweithdrefn) (Cymru) 2016.
Dim ond i Ymgynghoreion Arbenigol y mae dogfennau a farciwyd yn gyfrinachol ar gael a byddant yn cael eu darparu ar gais.
Draft Application for Planning Permission
Site plan
Acceptance of notification
Design and access statement
Draft Environmental Statement
Chapter 1 Introduction
Chapter 1 – Technical Appendices
1.2 EIA Scoping Direction and Addendum
Chapter 1 – Figures
Chapter 2 Description of the Proposed Development
Chapter 2 – Technical Appendices
2.1 Outline Construction Environmental Management Plan (CEMP)
2.2 Outline Battery Safety Management Plan
Chapter 2 – Figures
Chapter 3 Environmental context and reasonable alternatives considered
Chapter 3 – Figures
Chapter 4 Approach to EIA
Chapter 4 – Technical Appendices
4.1 AILR Environmental Constraint Review
4.3 Arboricultural Impact Assessment
Chapter 5 Terrestrial Ecology
Chapter 5 Terrestrial Ecology – Main statement
Chapter 5 Terrestrial Ecology – Main statement
Chapter 5 – Technical Appendices
5.4 Outline Habitat Management Plan
5.5 Ecology Habitats Regulations Assessment
Chapter 5 – Figures
Chapter 6 Ornithology
Chapter 6 Ornithology – Main statement
Chapter 6 Ornithology – Main statement
Chapter 6 – Technical Appendices
6.2 Collision Risk Model Analysis
6.3 Ornithology CONFIDENTIAL
6.4 Habitats Regulations Assessment – Ornithology
Chapter 6 – Figures
Chapter 7 Land, soils, and water
Chapter 7 Land, soils, and water – Main statement
Chapter 7 Land, soils, and water – Main statement
Chapter 7 – Technical Appendices
7.1 Flood Consequences Assessment
7.2 Watercourse Crossing Schedule
7.3 Water Framework Directive Assessment
7.4 Outline Peat Management Plan
7.5 Peat Slide Risk Assessment
7.7 Groundwater-Dependent Terrestrial Ecosystems Assessment
7.8 Private Water Supplies Risk Assessment
7.9 Outline Soil Management Plan
7.10 Outline Drainage Strategy
Chapter 7 – Figures
Chapter 8 Cultural heritage
Chapter 8 Cultural heritage – Main statement
Chapter 8 Cultural heritage – Main statement
Chapter 8 – Technical Appendices
8.2 Geophysical Survey Report: Foel Fach Wind Farm
8.4 Geophysical Survey Report: Foel Fach Wind Farm, UAV Magnetometer Survey
Chapter 8 – Figures
Chapter 9 Landscape and visual
Chapter 9 Landscape and visual – Main statement
Chapter 9 Landscape and visual – Main statement
Chapter 9 – Technical Appendices
9.1 Landscape and Visual Impact Assessment Criteria
9.3 Night Time Lighting Assessment Methodology
9.4 LANDMAP Detailed Assessment
9.5 Special Landscape Areas Assessment
9.6 National Landscapes Assessment
9.7 National Park Assessment Part 1
9.7 National Park Assessment Part 2
9.7 National Park Assessment Part 3
9.7 National Park Assessment Part 4
9.7 National Park Assessment Part 5
9.8 Preliminary Assessment of Receptor Groups
9.10 Residential Visual Amenity Assessment
9.11 Visualisations: Viewpoints 1 to 21 Part 1
9.11 Visualisations: Viewpoints 1 to 21 Part 2
9.11 Visualisations: Viewpoints 1 to 21 Part 3
9.11 Visualisations: Viewpoints 1 to 21 Part 4
9.11 Visualisations: Viewpoints 1 to 21 Part 5
9.11 Visualisations: Viewpoints 1 to 21 Part 6
9.11 Visualisations: Viewpoints 1 to 21 Part 7
9.11 Visualisations: Viewpoints 1 to 21 Part 8
9.11 Visualisations: Viewpoints 1 to 21 Part 9
9.11 Visualisations: Viewpoints 1 to 21 Part 10
9.11 Visualisations: Viewpoints 1 to 21 Part 11
9.12 Candidate National Park Assessment
9.13 Additional Wireline Visualisations
9.14 Preliminary Report on the Visibility of Aviation Lights at Foel Fach
Chapter 9 – Figures
Chapter 10 Noise
Chapter 10 Noise – Main statement
Chapter 10 Noise and Vibration – Main statement
Chapter 10 – Technical Appendices
10.1 Wind Turbine Construction Noise Report
10.2 Wind Turbine Operational Noise Report
Chapter 10 – Figures
Chapter 11 Traffic and transport
Chapter 11 Traffic and transport – Main statement
Chapter 11 Traffic and transport – Main statement
Chapter 11 – Technical Appendices
Chapter 11 – Figures
Chapter 12 Aviation
Chapter 12 Aviation – Main statement
Chapter 12 Aviation – Main statement
Chapter 13 Climate
Chapter 13 Climate – Main statement
Chapter 13 Climate – Main statement
Chapter 13 – Technical Appendices
13.1 Carbon Balance Assessment
Chapter 14 Cumulative Effects
Chapter 14 Cumulative effects – Main statement
Chapter 14 Cumulative effects – Main statement
Chapter 14 – Technical Appendices
14.2 Intra-project Screening Assessment
Chapter 14 – Figures
Chapter 15 Summary of Effects
Chapter 15 Summary of Effects – Main statement
Chapter 15 Summary of Effects – Main statement
Non-technical Summary
Non-Technical Summary of the Environmental Statement
Crynodeb Annhechnegol o’r Datganiad Amgylcheddol
Green Infrastructure Statement
Green Infrastructure Statement
Planning Statement
Socio-economic Statement
Secondary Consent
Common Land Application
CL59
Section 16 Application for CL59
CL80